Home | 中文版
 
 
The reconstruction work for Kao-No.132 line from 0K+000 to 1K+200 started on December 14, 2000 and was completed in April 2013; moreover, it costs about 7 hundred million NTD. De-Le-Rih-Ga bridge straddles Jhuoko river is 880 meters long, 10 meters wide and maximum of bridge height is 52 meters. It is the 3rd high pre-stressed box type bridge in Taiwan and the maximum depth of pier foundation is 38 meters. The bridge was open on April 20, 2013 and the ceremony was hold on May 11,2013.